Environmental Drilling Services

C&S Environmental Consulting has the equipment, experience, and specialized expertise to complete your environmental drilling project on time and within budget. Our highly-trained drill crews place great emphasis on safety, project management, and quality control.

Our new Geoprobe® 3230DT drill rig combines advanced dual tube direct push sampling and high-speed auger drilling capabilities with a 24 ft telescopic mast. See Mr. Colliers comments on the Geoprobe website “This is a great rig, and we are pleased,” Buford added, “but no one can beat your [Geoprobe®] support! I knew that going into this machine purchase. I’ve run other drill rigs in my life, and no one treats us as good as you guys!”

Geoprobe says “The 3230DT may be the most versatile machine Geoprobe Systems® has ever designed and manufactured. Big statement, but we think we’ve got the facts and feedback to back that up.

The Geoprobe® 3230DT is a mid-sized tracked drill rig combining advanced direct push functionality with traditional auger drilling capabilities. All of the features of the 3230DT come together to create a platform that’s efficient as to what it does. You may not use all of the functions on every project, but if you need to delineate an area, collect confirmation samples, then drill and set wells, it is all there in one rig.  It transitions from direct push to drilling in less than five minutes!”

Environmental Direct-Push Sampling

  • Soil/Groundwater Sampling
  • Dual Tube Sampling
  • Groundwater Monitor Wells; (Temporary and Permanent)
  • 1” and 2” Groundwater Well Installation with Direct Push
  • Soil Vapor Probes
  • Injection Probes
  • Minimal Disturbance to Samples
  • Minimal Generation of Investigation-Derived Wastes
  • Drill Crews with 40-Hour Hazwoper Training
  • Logging Services by a Professional Engineer or Professional Geoscientist

Environmental Drilling / Sampling

  • Soil/Groundwater Sampling
  • 5” Solid Flight Augers w/2-foot Split Spoon Samplers or Shelby Tube Sampling
  • 8-1/4” OD Hollow-Stem Augers w/5-foot Split Spoon Samplers
  • 10-1/4” OD Hollow-Stem Augers
  • 1”, 2” and 4” Groundwater Monitoring Wells Installed
  • Recovery Wells Installed
  • Landfill Gas Probes Installed
  • Drill Crews with 40-Hour Hazwoper Training
  • Logging Services by a Professional Engineer or Professional Geoscientist